|
Description of work: demolish and replace the existing 3 span steel superstructure with a new single span steel superstructure including abatement of hazardous lead based coatings on all steel materials; replace the west abutment wall and rehabilitate the east abutment wall; refurbish the north and south fascia girders; refurbish the bridge pedestrian railing; reconstruct the northwest staircase and Yesler Way retaining wall; replace the existing 12” watermain with a new 12” watermian attached to the bridge; and reconstruct the Yesler Way and Terrace Street utilities and roadways in the vicinity of the bridge. Contract duration is 300 working days.
We are an Equal Opportunity Employer and request sub-bids from all contractors and suppliers including Minority, Women, Disadvantages, Disabled Veterans and Emerging Small Business Enterprises for the following areas of work: Concrete Demo, Sawcutting, Crane, Equipment, TESC, Concrete Flatwork, Signage, Electrical, HVAC, Utility, Earthwork, Painting, Reinforcing Steel, Railing, Pavement Markings, Traffic Control, Survey, Building Condition Survey, Asphalt Paving and Milling.
DBE mandatory goal requirement: 18%
PCL is available to assist interested DBE firms in obtaining adequate information about the contract plans, specifications and requirements for this project. PCL is available to discuss breaking the work into economically feasible units to maximize the opportunity for participation by DBE firms on this project and encourages DBE firms to follow up with our estimating staff as early as possible, to engage in discussions about the scope of work they are capable of providing.
Documents are available on Seattle DOT website: https://www.ebidexchange.com/seattle. These documents are also available at PCL’s office in Bellevue, WA.
Interested firms please email TigSeaEstim@PCL.com or fax (425) 394-4296. |