Project Title
  UW Power Plant Air Compressor #2 and #3 Replacement
Type of Post
  Request for proposals
Project Owner
  University of Washington
Link to original solicitation
  http://cpo.uw.edu/business/constr-opp
Estimated Contract Value
  $NA
Bid Close: Date and Time
  Part I at 2:00pm May 18, 2016; Part II at 3:00pm May 18, 2016
Specific instructions: bid closing, mandatory meeting, bonding, insurance…
  Pre-Bid Site Meeting May 3, 2016 at 10:00am.
Bid Bond is required.
Payment and Performance Bonds are required.
Insurance is required.
Subcontractor / Supplier Goals, Set Asides, Preferences
  Voluntary goals of 10% MBE and 6% WBE. Participation may be on a direct basis, or as a subcontractor or supplier.
Scope of work
  The UW Seattle campus’ Central Utility Plant (CP) provides compressed air for all buildings on the Seattle campus. The CP has four installed air compressors of varying capacities and a highly customized air dryer system. Compressors 1, 2, and 3 are Worthington reciprocating air compressors at least 40 years old. Compressor #4 is a relatively new Atlas Copco screw type compressor; 500 hp with 2175 SCFM capacity. This project will idle compressor #1 and replace compressors #2 and #3 with new compressors of similar capacity to existing compressor #4. This will provide the CP with three full capacity compressors to meet the campus’ demand; i.e. one plus two spares to allow for 100% redundancy at all times. The project will also demo the existing air dryer system for all four compressors and install new heat of compression rotary drum dryers on each compressor (#2, #3, and #4).
Point of contact – Please include their name, job title, phone, fax, and email address.
  Harris Group
Ken Murphy
206-494-9546

Our goal under Economic Development is to report financial and job growth through our assistance as an aggregate to clients and partners. If your company is awarded a contract related to this opportunity (or other opportunities) and/or added jobs, please let us know. We greatly appreciate your attention to this detail which allows this program to continue to provide services at no-cost to you. Award Reporting Form or report in your Bid Match Portal.